Path surfaces 2018-02-27T13:38:13+00:00

Path surfaces

There are existing shared paths within the PBN where path surfaces do not meet the needs of the local communities. Several paths within the PBN network are required to be upgraded to a sealed surface to ensure a smooth riding surface and encourage greater utilisation of the PBN.
For example, the Dandenong Creek Trail is primarily surfaced as concrete. However, the 7km section of gravel path between Greens Road, Dandenong South and the Mornington Peninsula Freeway, Carrum needs upgrading to concrete as it is unfavourable for cyclists and inconsistent with the rest of the trail.

13308635_1024979990914694_6727628424528915335_o